Categories
Society

[2855] Improvement TnG must make to create better train commuting experience

The use of Touch ‘n Go (TnG) payment system as the sole cashless payment option for KL trains, specifically those operated by RapidKL, in my opinion has been unnecessary. TnG is inferior to the native cashless system that RapidKL had previously.

Prior to the full migration, the trains accepted multiple payment options, but the superior method to me was the native cashless payment. Topping-up was easy and free. It was hassle-free relative to having to use TnG cards. In case of any problem with the native payment system, the station attendant would be able to help out the users almost immediately. Even the problem would be solved quickly on the spot. In contrast, trouble with TnG cards would require users to put in extra effort to reach out to TnG and their vendors, and their customer service takes time to respond to you.

Unfortunately in July-August 2017, the superior option was phased out in favor of the TnG cashless payment method. The official reason for the migration is most mind-boggling. The whole RapidKL network— the monorail, the LRT, the MRT and the buses — needs to phase out the native cashless system because after billions of public money spent on the MRT, the new MRT line has troubles processing the native cashless system.

But hey, it could process TnG system just okay. Why is that?

Instead of making the MRT line integrated into the existing widely usely system, the whole train network has to be integrated into underused MRT’s line and with weak payment method.

I have yet to come across the explanation the MRT payment method is that bad, and how that was possible. It feels like somebody overlooked the payments side. Just saying the MRT could not accept the native cashless payment and so, the migration had to happen is not enough. There has to be an explanation why the MRT payment method is that bad. It is either somebody overlooked it, or the system has been captured by special interest.

But the train has moved on and missed a station.

So, rather than moving back to the old system and possibly incur additional migration cost (I do not know whether the TnG system is cheaper than the native cashless system for RapidKL to operate; this is something to watch out for), I think the better way now is to improve the current system.

Here is a list of things I would want to see happening soon in order to improve train commuting experience for everybody, except for Najib Razak:

  1. Place TnG reloading machines at all train stations. At the moment, most stations do not have the machines, which offer free top-up services. This forces users to go to other places to reload and incur top-up charges (imagine, being forced to use TnG and then having to pay fees to top-up). In contrast, all stations have many machines that could process the native cashless payments (and even so, places like KLCC had trouble keeping the lines short: imagine the situation with TnG now). Furthermore, all those native machines have now been rendered unnecessarily obsolete by the full TnG migration. How much money has been wasted? Sounds like a job for the Auditor General.
  2. Have more than one machine at all stations. One would have thought for such a high volume traffic network, TnG would place a lot of machines for train users. But no. Even at KL Sentral, the hub of the city’s transportation, I could spot only 2 or 3 TnG reloading machines. The limited availability of the machines, which forces users to top-up at other places like 7-Eleven and incur top-up fee, makes me suspect this is intentional. It feels like a classic rent-seeking exercise, which possibly a case Malaysian Competition Commission should look into (I am toying filing a complaint. I have read the submission guidelines and it is not that hard to digest).
  3. Upgrade the reloading machines to process commands faster. Right now, it takes several minutes to complete a transaction. It is slower compared to RapidKL’s machines, which by the way, are now underutilized and processing cash payments only. One would operate the old native machines for cashless transactions like this: you touch the screen, insert cash and go. It is possible to do this under one minute unlike the so-called Touch ‘n Go machines, which require the patience one would reserve for a dead turtle.
  4. Upgrade the reloading machines to enable it to give refund at point of sale. The slow inadequate TnG machines could only receive cash. There is simply no slot to spit out cash. In case of failed transaction, no refund is possible. For refund, users would have to contact TnG customer service over the phone and such response does not happen immediately. I have been waiting for nearly three hours to get a refund. I complained to the station attendant, who redirected me to TnG’s external vendor. I have also complained to TnG and demanded my refund, which they later redirected me to the same external vendor. The vendor has yet to reply to my request. In contrast, the whole refund process would happen immediately under the old system, because refunding is possible at the point of sale. Transformation indeed.
  5. Until these suggested improvements have been made, TnG must suspend top-up fee charged at other top-up locations. Top-up should be free from the time being.

Suggestion 1-4 are investments TnG should have made when it knows it would be the sole payment option for the high-volume traffic train network. TnG clearly has underinvested in its infrastructure, happy to take in revenue it does not deserve.

Categories
Photography Travels

[2827] That kid on the Galle train

I have just returned from my Sri Lanka backpacking trip. I needed that vacation but now that it is done, I am suffering from a mild holiday blues. It is a kind of depression that makes you go back to your photo collection and relive the journey.

I took a train down to Galle from Colombo with a newly made friend. The train was full and we had to sit by the door, close to the stinky toilet, which was really a room with a hole on the floor. Yea, when the train stopped, it did not smell nice at all.

But the train stopped often between the two cities. Though it was nothing out of the usual, curiosity led many to pop their head out the window, including this kid.

A kid on the Colombo-Galle train

Sigh… I need another vacation to recover from the blues.

Categories
Society

[2824] The good, the bad and the ugly of the LRT extension line

Kuala Lumpur opened the extension to its light rail transit lines late last month and I was pretty excited about it. After years of delay, the system is finally here.

I am excited because I can now hop on a train to Subang with ease. Previously, I would either have to drive, get on a cab or take the KTM Commuter trains. The Commuters are not as convenient as the LRT. Frequency is low and it connects places which I have little reasons to go to. In contrast, the LRT extension also means I now have easy access to the Subang airport too.

Another reason for my excitement is that I really love trains. I try to ride on the train everywhere I go to observe the city and the people. Even in Jakarta when the city rail system is not as mature as those in Singapore, Kuala Lumpur or Bangkok. I also regularly read on the read, that is to say I have time for myself in contrast to, for instance, driving.

I rode on the train yesterday and made a loop from the Masjid Jamek Station to the new Putra Heights Station via Kelana Jaya, and back through the Sri Petaling Line. That took me close to 5 hours and I started at about 5PM, running for 40km-50km. The total extension length itself is about 35km.[1][2]

I could not see the outside half of the ride as it was getting dark by the time I reached Putra Heights. I think I will have to make another loop and this time, probably earlier in the day during the weekends to fully appreciate the view.

So, this is a review by a regular LRT user (yes, I am a libertarian who loves public transport. Sue me).

Bad finishing

While the trains themselves are great, so far, I feel the construction of the stations has not been done properly. I got off at several stations and I noticed mediocre finishing. There is a feeling the stations were completed in haste despite long construction delays.

I remember two particular stations with noticeable defects. The escalator at the Lembah Subang Station was creaking, making a loud noise of grinding metals. Mind you, this is a new system and it is already showing sign of stress. With all the escalator incidents elsewhere — some of it deadly — I was not fully sure it was entirely safe.

The escalator at SS15 station was also creaking albeit less loudly. I could feel it straining as I rode down. The descent speed was less than optimum and uneven at times, which possibly has something to do with the straining.

More disappointingly are the washrooms and I am writing specifically about the SS15 station. The faucets open too close to the wall of the basin, making it awkward for me and for anybody with non-midget sized hands to wash up. My fingers would hit the wall easily. I feel the pipes should have extended farther to the center of the sink instead of stopping at the edge, barely.

Several faucets were leaking too, leaving a pool of water on the floor, which turned the whole place disgusting. The dryer also did not work. This might be just a teething problem, but the history of KLIA2 (and the East Coast Highway too?) for instance, it does not inspire confidence. The extension just opened for heaven’s sake. These problems should not exist.

I did not get out of the stations because I did not want to spend too much money. It cost me less than three ringgit to make the ride, because the stations I entered and exited were close by. Neither did I get off at every station. That would the time consuming for a layperson. If I had, I am sure I could find more defects. After all, I randomly got off two stations and the hit rate of finding noticeable defects is 100%. There is a prima facie case to suspect there is a systemic problem with the line.

Who were the contractors of these stations? Given the previous controversies involving contract awards, that question will be important in running a post-mortem on the project. An audit should be carried out and its findings be made public. These contractors should be forced and fined to remedy those defects.

Interchange done right, and wrong

But there is nice stuff to say about the overall system.

The interchange at Putra Heights is done marvelously. If there is an ideal interchange in the whole wide world, this is it. It reminds me of the MRT interchange to Changi Airport in Singapore. You would just have to get out of the train, stay on the same island platform and wait from the next train to arrive on the other side, possibly 10 meters away only. No unnecessary 5 minutes walking is through a mall like in KL Sentral is required.

But I also have to comment about the interchange at Sri Petaling. I do not like it. I had to switch trains and platforms. Sri Petaling has side platforms, which means I had to get on a crossing to get to the other side. More annoyingly, the Putra Heights-Sri Petaling segment is not integrated seamlessly with the Sri Petaling Line, unlike the whole Gombak-Kelana Jaya-Putra Heights segment. I understand why I need to switch trains Putra Heights (Mahathir’s legacy), but less so at Sri Petaling.

Refreshing station designs

I short, I like the design. It feels sleek just like the Kelana Jaya trains.

More importantly, the platforms are huge compared to the old ones. It is just less claustrophobic during rush hour. The situation at stations like KLCC and Masjid Jamek can be extremely unpleasantly and packed with people. Worse, they are underground although air-conditioned stations. But things are not that much better at above ground stations like Setiawangsa, Jelatek, Pasar Seni and even KL Sentral. There just is not much platform space to accommodate massive crowd.

The large platform space at the new stations comes with large envelope cover, which is essential to a rail system in a tropical country like Malaysia. At the old above ground stations, rainstorm would make everything wet and since the flooring are marble-like, dangerously slippery too. The new stations, with the way the platforms are designed and covered, are unlikely to have the same problem, although I would think it would get hot and humid quick. I do not remember whether there was an air-conditioning system moderating the temperature but for the old above ground platforms, a simple cheap fan would work.

But the cover also means the glorious view of KL as seen from Wangsa Maju, Setiawangsa, Jelatek, Keramat, Damai, Pasar Seni, Asia Jaya and Universiti among others is not available at the new stations. That is a downer for me.

But I suppose the envelope cover is a blessing for Puchong stations, which are surrounded with ugly landscape.

Perhaps, if the LRT lines are to be improved further in the future, it should involve the expansion of platform space at popular stations.

Politics of credit and blame

With respect to the old station design, I do not blame the old architects and engineers. The earlier LRT system was put in place at a time when KL population was smaller. Najib Razak when launching the LRT extension line blamed Mahathir Mohamad for not investing more in public transport.[3]

This is off the mark by a mile because Najib ignored the reality of the 1990s when Subang was just expanding and Puchong was a wilderness instead of the industrial town it is now. The Klang Valley population size just did not warrant a further train investment then.

It is arguably only now that we have such population to justify further investment into the city rail system, with suburbs sprawling to the west and the south.

Najib happily takes the credits for the completion of the LRT extension project and further expansion of the KL rail network. But of course, what he did not mention is the fact that the project was supposed to be completed in 2014. Furthermore, Najib takes credits more than the completion of the project. He bashed Mahathir for not providing a comprehensive public transport system but the closer integration of the system really happened during Abdullah Badawi’s time. Indeed, the reorganization of the line management occurred post-1997 crisis under Mahathir. These integrations were the foundation Najib built on.

For a system that takes more than a generation to mature, it is hard to take credit and assign blame cleanly. Politicians should realize that.

Mohd Hafiz Noor Shams. Some rights reservedMohd Hafiz Noor Shams. Some rights reservedMohd Hafiz Noor Shams. Some rights reserved

[1] — The Kelana Jaya Line Extension will begin from Kelana Jaya station and pass through 13 new stations, including Ara Damansara, Subang Jaya and USJ before ending at Putra Heights Integrated Station, covering a distance of 17.4km. Total length of the Kelana Jaya Line upon completion of the LRT will be 46.4km. [MyRapid. Kelana Jaya Line. Accessed July 12 2016.

[2] — The Ampang Line Extension starts from Sri Petaling Station and passes through Kinrara, Puchong, and ends at Putra Heights. The extension is 17.4km long with 12 new stations. Combined with the existing line, the total length of Ampang Line after the completion of the LRT Line Extension Project will be 45.1km. [MyRapid. Ampang Line. Accessed July 12 2016.

[3] — Prime Minister Datuk Seri Najib Razak took a swipe at Tun Dr Mahathir Mohamad today, blaming him for the underdeveloped state of the country’s public transportation network. At the launch of the Kelana Jaya and Ampang LRT Line Extension today, Najib said he made improving public transportation a priority when he became prime minister as the issue had become “increasingly serious.”

“This is because my predecessor who ruled for 22 years did not pay much attention to public transportation,” he said at the launch ceremony here.

“Therefore it created a vacuum, it caused underinvestment, it created a poorly integrated system owned by multiple people that cannot accommodate the needs of a modern city, and the traffic congestion has gotten more serious.” [Aizyl Azlee. Malay Mail Online. Najib blames ”˜predecessor’ for current public transport woes. June 30 2016.

Mohd Hafiz Noor Shams. Some rights reservedMohd Hafiz Noor Shams. Some rights reservedMohd Hafiz Noor Shams. Some rights reserved

p/s — I have also read that there is a problem of access for all the new stations. Pedestrians face barriers to entry either in the form of fence, road or unrealistic walkway. One criticism I have frequently so far is that the stations are designed for cars to drop off passengers. Sigh…

The old stations do not suffer too much of this problem and I think they are quite pedestrian-friendly in terms of access, except, maybe the Abdullah Hukum station. For the longest time and still is, that particular station stops in the middle of nowhere. Hardly anybody uses it. One hopes that would change when the KL Eco City development is completed, linking the station to the Garden and Mid Valley.

Mohd Hafiz Noor Shams. Some rights reservedMohd Hafiz Noor Shams. Some rights reservedMohd Hafiz Noor Shams. Some rights reserved

p/s — MP Ong Kian Ming has a wider review of the train system in KL.

Categories
ASEAN History & heritage

[2367] From Tanjong Pagar to Woodlands

I meant to write this more than a year ago when Prime Minister Najib Razak announced that the Malaysian government agreed to relocate Keretapi Tanah Melayu’s terminus from Tanjong Pagar to Woodlands. News that the Tanjong Pagar Station will finally close on July 1 encourages me to open up my archive of unfinished writings and finish this particular entry.

While the agreement has improved relations between Malaysia and Singapore, which is good, I was disappointed with the decision, and remains so today.

It is a disappointment because Tanjong Pagar is the last visible link that exists between the two countries, harking back to a time when Singapore was part of colonial Malaya and later modern Malaysia. It reminds Malaysians and Singaporeans alike that we share a common past. There was a dream unrealized; Singapore to Kuala Lumpur as New York to Washington D.C.

For regionalists who dream of a closer Southeast Asia, the link provides concrete infrastructure to that dream.

The dream will live on, even without Tanjong Pagar. And of course, the link is not severed at all. It is only shortened. Woodlands is still in Singapore after all.

Still, the link to Tanjong Pagar is special. It is special not just because of the past but also for what it can be. A high-speed train between Kuala Lumpur and Singapore will greatly enhance people-to-people interaction.

Even so, the KL-Singapore high-speed train link is only part of a bigger dream. Imagine a Penang-KL-Singapore link. Imagine a Bangkok-Penang-KL-Singapore link. Imagine bigger.

Of course. Of course. Of course there is still Woodlands. But the experience will be vastly different. Trains are not supposed to be like airports, detached from cities with all the associated hassle. Trains are supposed to be convenient. One embarks in a city only to disembark in another city.

Woodlands is nowhere. Like Changi. Like Sepang. Unlike Brickfields. Unlike Tanjong Pagar.

Categories
Society

[2329] Just one ticket, please

I have been to a number of cities with superb rail networks before but I hardly took any notice of them. I simply took the convenience that came along with them for granted. I have come to conclude that any good big city will always have a good rail network servicing the city and its suburbs. The fact that a city has one is not something that quickly impresses me anymore.

While I was wandering the streets of Paris, the issue of the planned mass rail transit system in Kuala Lumpur began to dominate Malaysian headlines. Paris is famous for many things and one of those things is its dense rail network called the Metro. With the MRT in mind, I began to compare the Metro to the existing rail network in Kuala Lumpur.

It is probably unfair to make that comparison. The French capital began building its system nearly a century earlier than Kuala Lumpur did. The French had a lot of time to build and to perfect their network while Kuala Lumpur is still building its network. Nevertheless, there are things Kuala Lumpur can learn from Paris.

One of them is definitely how the lines are integrated, given how badly the network in Kuala Lumpur performs in this respect. Prime examples of lack of integration are the monorail line at KL Sentral, the light rail transit stations at Masjid Jamek and the distance between the Bukit Nanas monorail station and the Dang Wangi station on the Kelana Jaya LRT line.

The planned MRT is poised to repeat these past mistakes. One station belonging to the MRT line is not going to be constructed at KL Sentral but somewhere near to the transportation hub of the city. The distance between the hub and the planned MRT station appears to be farther than the distance between the hub and the nearby monorail station.

The need to travel the distance to change trains is an annoyance for commuters but sometimes it is understandably unavoidable. The issue of cost, land ownership or other innocent constraints may prevent perfect integration between lines. In Paris, there are places where one has to walk for a considerable distance to change trains.

The ticketing system in Paris fortunately makes the action less of a chore. Whatever the train line a commuter needs to take, he or she simply needs to buy the ticket once. There is no need to buy a different ticket for a different line. That means there is no need to queue at the counter or machine multiple times. It also means a commuter need not pass through a ticket verification barrier one time too many.

In Kuala Lumpur, different lines have their own tickets. The need to purchase multiple tickets because one needs to change trains causes long queues. Add to that the fact that these machines in Kuala Lumpur tend to accept exact change only, never mind that some of these machines tend to be offline typically; riding the trains can be an extremely stressful experience.

There is of course the Touch ”˜N Go and other cards that partially address the problem of lack of ticket integration across all the intracity lines.

Yet, not everybody can afford to store considerable credit in those cards and even if affordability is not an issue, not everybody wants to use it. Many times, individuals need to ride the intra-city train infrequently. That makes these cards a relatively expensive investment for a person in a country where a lot of individuals earn less than RM2,000 per month.

My suggestion for the new MRT line and together with the LRT network is this: if the intracity lines cannot be integrated physically with verification barriers placed everywhere, at least integrate its ticketing systems. Since the LRT is under Syarikat Prasarana Negara and so too the MRT eventually, surely such an integration will not be too hard to do.

And yes, please make those machines a little bit more flexible in accepting bills.

Mohd Hafiz Noor Shams. Some rights reserved Mohd Hafiz Noor Shams. Some rights reserved Mohd Hafiz Noor Shams. Some rights reserved

First published in The Malaysian Insider on March 2 2011.